OEM · ODM · From spec to product

Your logo, our silicon.
Your margin, our discipline.

Six steps from a first inquiry to a branded, warrantied product — with customization levels priced plainly and the SDK free from day one.

The six-step OEM path

Spec sheet

One page: product, volumes, environment, interface. We answer with a model match list in 48h.

Mechanical check

2D/3D drawings supplied at sample stage; FAE validates window, depth and mounting tolerance.

SDK bring-up

Free SDK and demo routines: one working evaluation on your board before anything is quoted.

Sample

1–3 days ship, mixed orders welcome; express transit 3–5 days; 2-year warranty from the first unit.

Beta batch

A few hundred pieces carry your logo, box and firmware — field statistics before the big run.

Mass production

10–25 days below 5,000 pcs; lot test reports, ESD-safe packing and continuous FAE line.

Customization options, leveled

OptionWhat changesEntry volumeLead time
Logo & silkscreenModule marking, fascia logo, box printingFrom a few hundred pcsQuoted per project
Firmware parametersThresholds, template capacity, reader behavior, menu stringsNo MOQ gate on hardware10–25 days with production
Cable & connectorPin-out, length, connector class per your harnessPer projectQuoted per project
UI language & fontsTerminal menus, faceplate text, voice prompt for pay boxesFrom a few hundred pcsQuoted per project
Housing / fascia toolingTerminal ODM: screen bezel, keypad, finishPer project (tooling)Schedule at kickoff
Compliance file packTechnical file structure, pre-scan data, BOM evidence for CE/FCC-class routesPer project1–2 weeks typical

Every option is confirmed in writing after a sample pass. We do not gate standard datasheets, SDKs or demo routines behind any customization volume.

BFC388 dual-lens face module for slim lock fascia
Case · Face module into a slim lock fascia

Six weeks from spec to styling.

A door OEM needed dual-camera liveness inside a 9 mm-thin fascia without moving the RGB+IR axes apart beyond usable stereo margin. This is how it resolves:

  • Day 3 — BFC388 dual-lens platform matched: USB 2.0, ±20° class head rotation covered by module firmware, not by customer software.
  • Week 2 — drawings, SDK demo and a 1 pc sample on the bench; production firmware parameters written to the OEM's capacity tier.
  • Week 6 — first beta batch branded and shipped; recognition rate audited at lot level per the standard report.

Design guide FAQs

Datasheets and the SDK are immediate. 2D/3D drawings and demo videos leave with the sample order — typically within 1–3 days of the request.

Silkscreen and box customization start around a few hundred pieces; firmware parameter changes are quoted per project and carry no MOQ on the hardware itself.

Yes — FAR/FRR thresholds, template counts, reader behavior and menu strings are configuration items in the SDK; no die change needed.

Technical-file structure, pre-scan results and BOM evidence for CE/FCC/RoHS-class routes — scoped per directive and honestly labelled where a certificate is still pending.

Start the six steps today, cost-free.

A one-page spec sheet is enough: model match list, SDK package and sample offer within 48h. No customization order required to begin.

Send your spec sheet →